Work done on Oconee River Greenway Basins
The "Alice" basin was the area of interest for this study, as it effects the sidewalks and holds/moves large quantities of water. Flooding in this area happens often and the goal of this research was to determine how to best alleviate this issue. Extensive terrain modelling was done with the use of a total station. The work was compiled and edited using Excel and ArcMap.